PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Welding beams at Derrick -3 (3rd Floor) Facing North (800x600).jpg Continued compacting and backfilling Cafeteria Room 104 Facing North (800x600).jpg Continued excavation for the underground sanitary piping Facing East (800x600).jpg Continued saw cutting Rahway ave. under the bridge (800x600).jpg Platforms around Elev. 4-Stair -2 (3rd to 4th Floor) Facing South (800x600).jpg Sanitary piping at room 175A Facing East (800x600).jpg Sanitary piping at room 175B Facing North (800x600).jpg Unloading shear wall panels onto the 3rd floor for Elev. 1,2,3 Facing South (800x600).jpg Welded extension beam angles at Derrick -3 (2nd Floor) Facing South-East (800x600).jpg
Previous pageNext page Platforms around Elev. 4-Stair -2 (3rd to 4th Floor) Facing South (800x600)
Platforms around Elev. 4-Stair -2 (3rd to 4th Floor) Facing South (800x600)